Showing 801 to 900 of 1129 projects
Export CSV

Construction of Mutithi-Kinoo Waterpan

Construction of Mutithi-Kinoo Waterpan

Location

Maragua — Makuyu (Maragua)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 889720

Disbursed

KSh 889720

Completion

100%
Completed

Grading & gravelling works of Kiabene-Kiawathangati-Githigi-Kiunyu & Startway-Wanjohi & Nduru Main Road Access Road

Grading & gravelling works of Kiabene-Kiawathangati-Githigi-Kiunyu & Startway-Wanjohi & Nduru Main Road Access Road

Location

Maragua — Ichagaki (Maragua)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3518164

Disbursed

KSh 3518164

Completion

100%
Completed

Grading & gravelling works of Wanyoro-Marumi-Mathingira & Karia-ini Access Road

Grading & gravelling works of Wanyoro-Marumi-Mathingira & Karia-ini Access Road

Location

Kigumo — Kigumo (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 4750780

Disbursed

KSh 4750780

Completion

100%
Completed

Supply of Pipes & Fittings for Kinoo/Muthini Water Project

Supply of Pipes & Fittings for Kinoo/Muthini Water Project

Location

Maragua — Makuyu (Maragua)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 4564194

Disbursed

KSh 4564194

Completion

100%
Completed

Pipe supply for Wathia-ini-Manyatta-Rwangunu-Kangita Water Project

Pipe supply for Wathia-ini-Manyatta-Rwangunu-Kangita Water Project

Location

Maragua — Kamahuha (Maragua)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2468480

Disbursed

KSh 2468480

Completion

100%
Completed

Construction of Waiting bays at MauMau,NdunyuChege,Kiarutara & Whitegate

Construction of Waiting bays at MauMau,NdunyuChege,Kiarutara & Whitegate

Location

Gatanga — Kariara (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 899080

Disbursed

KSh 899080

Completion

100%
Completed

Emergency works carried out at Karie dumpsite-Murang'a County

Emergency works carried out at Karie dumpsite-Murang'a County

Location

N/A

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 252000

Disbursed

KSh 252000

Completion

100%
Completed

Grading and road opening works caried out in Murang'a North region as an emergency intervention-Murang'a County

Grading and road opening works caried out in Murang'a North region as an emergency intervention-Murang'a County

Location

N/A

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2164000

Disbursed

KSh 2164000

Completion

100%
Completed

Grading & gravelling of Muhuga-stage Access road

Grading & gravelling of Muhuga-stage Access road

Location

Kangema — Muguru (Kangema)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2214672

Disbursed

KSh 2214672

Completion

100%
Completed

Murang'a County Headquarters Building Renovation,Cabro works,Frontage Perimeter wall,Gate & Sentry

Murang'a County Headquarters Building Renovation,Cabro works,Frontage Perimeter wall,Gate & Sentry

Location

Kiharu — Township (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 14419960

Disbursed

KSh 14419960

Completion

100%
Completed

Construction of a Septic Tank for 200 Persons at Kandara Hospital-Murang'a county

Construction of a Septic Tank for 200 Persons at Kandara Hospital-Murang'a county

Location

Kandara

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1760270

Disbursed

KSh 1760270

Completion

100%
Completed

Maintenance of Streetlights and Floodlights within Murang'a County

Maintenance of Streetlights and Floodlights within Murang'a County

Location

N/A

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1320750

Disbursed

KSh 1320750

Completion

100%
Completed

Maintenance of Streetlights and Floodlights within Murang'a County

Maintenance of Streetlights and Floodlights within Murang'a County

Location

N/A

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1320750

Disbursed

KSh 1320750

Completion

100%
Completed

upgrading to bitumen standard of Kenol access road - Maragwa subcounty, upgrading to bitumen standard of mukuyu access road - kiharu subcounty and upgrading to bitumen standard of muthithi shopping centre access road - Kigumo subcounty

upgrading to bitumen standard of Kenol access road - Maragwa subcounty, upgrading to bitumen standard of mukuyu access road - kiharu subcounty and upgrading to bitumen standard of muthithi shopping …

Location

Kigumo

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 62527700

Disbursed

KSh 62527700

Completion

100%
Completed

upgrading to bitumen standard of ciumbu market access road - maragwa subcounty, upgrading to bitumen standard of Gacharage market loop access road - Kandara subcounty, upgrading to bitumen standard of kaguku market - mentor sacco loop access road - Ithanga subcounty, Upgrading to bitumen standard of kamune shopping centre/Market access road - Mathioya subcounty

upgrading to bitumen standard of ciumbu market access road - maragwa subcounty, upgrading to bitumen standard of Gacharage market loop access road - Kandara subcounty, upgrading to bitumen standard of …

Location

Mathioya

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 70747560

Disbursed

KSh 70747560

Completion

100%
Completed

Upgrading to bitumen standard of JCT Forthall Zabka Kabati - County Aggregated Industrial Park loop access road

Upgrading to bitumen standard of JCT Forthall Zabka Kabati - County Aggregated Industrial Park loop access road

Location

Maragua

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 56858560

Disbursed

KSh 56858560

Completion

100%
Completed

Upgrading to bitumen standard of Kanyenyaini market access road

Upgrading to bitumen standard of Kanyenyaini market access road

Location

Kangema

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 11176800

Disbursed

KSh 11176800

Completion

100%
Completed

Construction of kagira ECDE classrooms – gaichanjiru ward

Proposed construction of classrooms

Location

Kandara — Gaichanjiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2774450

Disbursed

KSh 2774450

Completion

100%
Completed

Construction of mugumoini e.c.d.e classrooms – gaichanjiru ward

Proposed construction of mugumoini e.c.d.e classrooms – gaichanjiru ward

Location

Kandara — Gaichanjiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2700980

Disbursed

KSh 2700980

Completion

100%
Completed

Grading & gravelling works of kariua police post road - gaichanjiru ward

Proposed grading & gravelling works of kariua police post road - gaichanjiru ward

Location

Kandara — Gaichanjiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1954948

Disbursed

KSh 1954948

Completion

100%
Completed

Renovation of thare primary & gathuthu ECDE classrooms - gatanga ward

Proposed renovation of thare primary & gathuthu e.c.d.e classrooms - gatanga ward

Location

Gatanga — Gatanga (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2302100

Disbursed

KSh 2302100

Completion

100%
Completed

Renovation of umbui ECDE classrooms and construction of toilet block – gatanga ward

Proposed renovation of umbui e.c.d.e classrooms and construction of toilet block – gatanga ward

Location

Gatanga — Gatanga (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1806050

Disbursed

KSh 1806050

Completion

100%
Completed

Construction of kinyongi ECDE classroom & renovation of gituri primary ECDE classroom – gaturi ward

Proposed construction of kinyongi e.c.d.e classroom & renovation of gituri primary e.c.d.e classroom – gaturi ward

Location

Kiharu — Gaturi (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2122644

Disbursed

KSh 2122644

Completion

100%
Completed

renovation of kibuu & gaitheri primary ECDE classrooms – gaturi ward

Proposed renovation of kibuu & gaitheri primary e.c.d.e classrooms – gaturi ward

Location

Kiharu — Gaturi (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2414890

Disbursed

KSh 2414890

Completion

100%
Completed

construction of rutune primary ECDE & renovation of kimathi primaryECDE – gaturi ward

Proposed construction of rutune primary e.c.d.e & renovation of kimathi primary e.c.d.e – gaturi ward

Location

Kiharu — Gaturi (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2432870

Disbursed

KSh 2432870

Completion

100%
Completed

renovation of gitugi primary ECDE classrooms – gitugi ward

Proposed renovation of gitugi primary e.c.d.e classrooms – gitugi ward

Location

Mathioya — Gitugi (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1820260

Disbursed

KSh 1820260

Completion

100%
Completed

renovation of kanjahi & kanooro primary e.c.d.e clasrooms – gitugi ward

Proposed renovation of kanjahi & kanooro primary e.c.d.e clasrooms – gitugi ward

Location

Mathioya — Gitugi (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2489710

Disbursed

KSh 2489710

Completion

100%
Completed

renovation of mungu-ini, kanyai & kiriti e.c.d.e classrooms – ichagaki ward

Proposed renovation of mungu-ini, kanyai & kiriti e.c.d.e classrooms – ichagaki ward

Location

Kandara — Ichagaki (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2308795

Disbursed

KSh 2308795

Completion

100%
Completed

construction of kyaume e.c.d.e classroom – ithanga ward

Proposed construction of kyaume e.c.d.e classroom – ithanga ward

Location

Gatanga — Ithanga (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1167459

Disbursed

KSh 1167459

Completion

100%
Completed

construction of kamaro e.c.d.e classroom – ithiru ward

Proposed construction of kamaro e.c.d.e classroom – ithiru ward

Location

Kandara — Ithiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2409450

Disbursed

KSh 2409450

Completion

100%
Completed

construction& renovation of matiraini primary e.c.d.e classrooms – ithiru ward

Proposed construction& renovation of matiraini primary e.c.d.e classrooms – ithiru ward

Location

Kandara — Ithiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1946915

Disbursed

KSh 1946915

Completion

100%
Completed

construction of githuya primary e.c.d.e classroom – ithiru ward

Proposed construction of githuya primary e.c.d.e classroom – ithiru ward

Location

Kandara — Ithiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1388827

Disbursed

KSh 1388827

Completion

100%
Completed

construction & renovation of riandegwa primary e.c.d.e classrooms – kagundu-ini ward

Proposed construction & renovation of riandegwa primary e.c.d.e classrooms – kagundu-ini ward

Location

Kandara — Kagundu-ini (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1901458

Disbursed

KSh 1901458

Completion

100%
Completed

renovation of kagundu primary & mairungi primary e.c.d.e classrooms – kagundu-ini ward

Proposed renovation of kagundu primary & mairungi primary e.c.d.e classrooms – kagundu-ini ward

Location

Kandara — Kagundu-ini (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2303106

Disbursed

KSh 2303106

Completion

100%
Completed

construction of dr. Irungu kang’ata e.c.d.e & toilet block – kahumbu ward

Proposed construction of dr. Irungu kang’ata e.c.d.e & toilet block – kahumbu ward

Location

Kigumo — Kahumbu (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1726630

Disbursed

KSh 1726630

Completion

100%
Completed

construction of mumbu primary e.c.d.e classroom & toilet block – kahumbu ward

Proposed construction of mumbu primary e.c.d.e classroom & toilet block – kahumbu ward

Location

Kigumo — Kahumbu (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1735395

Disbursed

KSh 1735395

Completion

100%
Completed

construction of mwanawikio b, (gatuikira) e.c.d.e classrooms – kakuzi/mitumbiri ward

Proposed construction of mwanawikio b, (gatuikira) e.c.d.e classrooms – kakuzi/mitumbiri ward

Location

Maragua — Kakuzi/Mitubiri (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2596020

Disbursed

KSh 2596020

Completion

100%
Completed

renovation works of kamune, wahundura & kirungu primary school e.c.d.e classrooms – kamacharia ward

Proposed renovation works of kamune, wahundura & kirungu primary school e.c.d.e classrooms – kamacharia ward

Location

Mathioya — Kamacharia (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 3728280

Disbursed

KSh 3728280

Completion

100%
Completed

construction of ndorome primary e.c.d.e classroom – kamahuha ward

Proposed construction of ndorome primary e.c.d.e classroom – kamahuha ward

Location

Maragua — Kamahuha (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1377637

Disbursed

KSh 1377637

Completion

100%
Completed

renovation of kahaini primary e.c.d.e – kamahuha ward

Proposed renovation of kahaini primary e.c.d.e – kamahuha ward

Location

Maragua — Kamahuha (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1171600

Disbursed

KSh 1171600

Completion

100%
Completed

construction of kaharati primary e.c.d.e classroom – kamahuha ward

Proposed construction of kaharati primary e.c.d.e classroom – kamahuha ward

Location

Maragua — Kamahuha (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1377637

Disbursed

KSh 1377637

Completion

100%
Completed

construction of mihangó, kitune and matanya e.c.d.e – kambiti ward

Proposed construction of mihangó, kitune and matanya e.c.d.e – kambiti ward

Location

Maragua — Kambiti (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 4614510

Disbursed

KSh 4614510

Completion

100%
Completed

construction of kangari town e.c.d.e classrooms and ablution block – kangari ward

Proposed construction of kangari town e.c.d.e classrooms and ablution block – kangari ward

Location

Kigumo — Kangari (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 3473116

Disbursed

KSh 3473116

Completion

100%
Completed

construction of kimotho primary e.c.d.e classroom and ablution block – kangari ward

Proposed construction of kimotho primary e.c.d.e classroom and ablution block – kangari ward

Location

Kigumo — Kangari (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2214958

Disbursed

KSh 2214958

Completion

100%
Completed

construction of mariira farm e.c.d.e clasroom and ablution block – kangari ward

Proposed construction of mariira farm e.c.d.e clasroom and ablution block – kangari ward

Location

Kigumo — Kangari (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2053958

Disbursed

KSh 2053958

Completion

100%
Completed

construction of nduini e.c.d.e classrooms – kanyenya-ini ward

Proposed construction of nduini e.c.d.e classrooms – kanyenya-ini ward

Location

Kangema — Kanyenyaini (Kangema)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2737400

Disbursed

KSh 2737400

Completion

100%
Completed

construction of wanyaga primary school e.c.d.e classroom – kariara ward

Proposed construction of wanyaga primary school e.c.d.e classroom – kariara ward

Location

Gatanga — Kariara (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1400130

Disbursed

KSh 1400130

Completion

100%
Completed

renovation works of gatakaini primary school e.c.d.e classrooms – kariara ward

Proposed renovation works of gatakaini primary school e.c.d.e classrooms – kariara ward

Location

Gatanga — Kariara (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1808020

Disbursed

KSh 1808020

Completion

100%
Completed

renovation works of karega primary, marumi primary & kaimiri primary e.c.d.e classrooms – kigumo ward

Proposed renovation works of karega primary, marumi primary & kaimiri primary e.c.d.e classrooms – kigumo ward

Location

Kigumo — Kigumo (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2215740

Disbursed

KSh 2215740

Completion

100%
Completed

grading & gravelling of gicici- kianjogu, cugu - kariga; kagogo-nyaga road– kihumbuini ward

Proposed grading & gravelling of gicici- kianjogu, cugu - kariga; kagogo-nyaga road– kihumbuini ward

Location

Gatanga — Kihumbu-ini (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 3753470

Disbursed

KSh 3753470

Completion

100%
Completed

renovation of kiunyu a, kigetho, njaini kahetho e.c.d.e classrooms – kihumbu-ini ward

proposed renovation of kiunyu a, kigetho, njaini kahetho e.c.d.e classrooms – kihumbu-ini ward

Location

Gatanga — Kihumbu-ini (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 4295200

Disbursed

KSh 4295200

Completion

100%
Completed

grading & gravelling works of kagaa access road - kimorori wempa ward

Proposed grading & gravelling works of kagaa access road - kimorori wempa ward

Location

Maragua — Kimorori/Wempa (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2056777

Disbursed

KSh 2056777

Completion

100%
Completed

construction of githanji primary e.c.d.e classroom & renovation of karungangi primary e.c.d.e – kimorori/wempa ward

Proposed construction of githanji primary e.c.d.e classroom & renovation of karungangi primary e.c.d.e – kimorori/wempa ward

Location

Maragua — Kimorori/Wempa (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2035800

Disbursed

KSh 2035800

Completion

100%
Completed

renovation works of senior chief gichohi primary, gangururu primary e.c.d.e classroms – kimorori/wempa ward

Proposed renovation works of senior chief gichohi primary, gangururu primary e.c.d.e classroms – kimorori/wempa ward

Location

Maragua — Kimorori/Wempa (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1959450

Disbursed

KSh 1959450

Completion

100%
Completed

construction of karugu e.c.d.e classroom and toilet block & renovation of p.k e.c.d.e classroom – kimorori/wempa ward

Proposed construction of karugu e.c.d.e classroom and toilet block & renovation of p.k e.c.d.e classroom – kimorori/wempa ward

Location

Maragua — Kimorori/Wempa (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2623280

Disbursed

KSh 2623280

Completion

100%
Completed

construction of kinyona primary e.c.d.e classroom – kinyona ward

Proposed construction of kinyona primary e.c.d.e classroom – kinyona ward

Location

Kigumo — Kinyona (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1897581

Disbursed

KSh 1897581

Completion

100%
Completed

opening of access roads - kinyona ward

Proposed opening of access roads - kinyona ward

Location

Kigumo — Kinyona (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1640240

Disbursed

KSh 1640240

Completion

100%
Completed

renovation works of rarakwa primary and gachocho primary e.c.d.e classrooms – kinyona ward

Proposed renovation works of rarakwa primary and gachocho primary e.c.d.e classrooms – kinyona ward

Location

Kigumo — Kinyona (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1416619

Disbursed

KSh 1416619

Completion

100%
Completed

renovaion of kiriaini primary, kiruru & kora primary e.c.d.e classrooms – kiru ward

Proposed renovaion of kiriaini primary, kiruru & kora primary e.c.d.e classrooms – kiru ward

Location

Mathioya — Kiru (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2557120

Disbursed

KSh 2557120

Completion

100%
Completed

renovation of kairo & kagio-ini e.c.d.e classrooms – kiru ward

Proposed renovation of kairo & kagio-ini e.c.d.e classrooms – kiru ward

Location

Mathioya — Kiru (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2266280

Disbursed

KSh 2266280

Completion

100%
Completed

construction & renovation of kiangima e.c.d.e classrooms – kiru ward

Proposed construction & renovation of kiangima e.c.d.e classrooms – kiru ward

Location

Mathioya — Kiru (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2088790

Disbursed

KSh 2088790

Completion

100%
Completed

construction of kanyururuku e.c.d.e classroom – makuyu ward

Proposed construction of kanyururuku e.c.d.e classroom – makuyu ward

Location

Maragua — Makuyu (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1667820

Disbursed

KSh 1667820

Completion

100%
Completed

construction of kaseve e.c.d.e classroom and ablution block – makuyu ward

Proposed construction of kaseve e.c.d.e classroom and ablution block – makuyu ward

Location

Maragua — Makuyu (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 3081330

Disbursed

KSh 3081330

Completion

100%
Completed

renovation of maji mazuri e.c.d.e classroom and construction of ablution block – makuyu ward

Proposed renovation of maji mazuri e.c.d.e classroom and construction of ablution block – makuyu ward

Location

Maragua — Makuyu (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2255650

Disbursed

KSh 2255650

Completion

100%
Completed

renovation of muchungucha & kiangochi primary e.c.d.e classrooms – mbiri ward

Proposed renovation of muchungucha & kiangochi primary e.c.d.e classrooms – mbiri ward

Location

Kiharu — Mbiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1382570

Disbursed

KSh 1382570

Completion

100%
Completed

construction of rurii e.c.d.e classroom & renovation of githuguya primary e.c.d.e classrooms – mbiri ward

Proposed construction of rurii e.c.d.e classroom & renovation of githuguya primary e.c.d.e classrooms – mbiri ward

Location

Kiharu — Mbiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2086170

Disbursed

KSh 2086170

Completion

100%
Completed

renovation works of st. Charles lwanga primary, yamugwe primary e.c.d.e classrooms- mugoiri ward

Proposed renovation works of st. Charles lwanga primary, yamugwe primary e.c.d.e classrooms- mugoiri ward

Location

Kiharu — Mugoiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2252740

Disbursed

KSh 2252740

Completion

100%
Completed

renovation works of kiyu primary, gitiri & gatudu primary e.c.d.e classrooms – mugoiri ward

Proposed renovation works of kiyu primary, gitiri & gatudu primary e.c.d.e classrooms – mugoiri ward

Location

Kiharu — Mugoiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 3442440

Disbursed

KSh 3442440

Completion

100%
Completed

construction of irewa e.c.d.e classroom – mugoiri ward

Proposed construction of irewa e.c.d.e classroom – mugoiri ward

Location

Kiharu — Mugoiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1291520

Disbursed

KSh 1291520

Completion

100%
Completed

construction of ngate e.c.d.e classroom – mugumoini ward

Proposed construction of ngate e.c.d.e classroom – mugumoini ward

Location

Gatanga — Mugumo-ini (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1346060

Disbursed

KSh 1346060

Completion

100%
Completed

renovation works of mugumoini and ithangarare primary school e.c.d.e classrooms – mugumoini ward

Proposed renovation works of mugumoini and ithangarare primary school e.c.d.e classrooms – mugumoini ward

Location

Gatanga — Mugumo-ini (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1767850

Disbursed

KSh 1767850

Completion

100%
Completed

construction of giatutu e.c.d.e classroom – mugumoni ward

Proposed construction of giatutu e.c.d.e classroom – mugumoni ward

Location

Gatanga — Mugumo-ini (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1298010

Disbursed

KSh 1298010

Completion

100%
Completed

renovation of gatundu-ini primary, gichui primary & karuri primary e.c.d.e classrooms– muguru ward

Proposed renovation of gatundu-ini primary, gichui primary & karuri primary e.c.d.e classrooms– muguru ward

Location

Kangema — Muguru (Kangema)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1207600

Disbursed

KSh 1207600

Completion

100%
Completed

renovation works of kahuhu primary, watuha primary & iyego primary e.c.d.e classsrooms – muguru ward

Proposed renovation works of kahuhu primary, watuha primary & iyego primary e.c.d.e classsrooms – muguru ward

Location

Kangema — Muguru (Kangema)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2396364

Disbursed

KSh 2396364

Completion

100%
Completed

grading & gravelling works of muhuga-stage road & muringaini watuha road –muguru ward

Proposed grading & gravelling works of muhuga-stage road & muringaini watuha road –muguru ward

Location

Kangema — Muguru (Kangema)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1487700

Disbursed

KSh 1487700

Completion

100%
Completed

renovation of kahatia primary e.c.d.e classrooms & construction of toilet block at karuri-ini primary e.c.d.e – murarandia ward

Proposed renovation of kahatia primary e.c.d.e classrooms & construction of toilet block at karuri-ini primary e.c.d.e

Location

Kiharu — Murarandia (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2039590

Disbursed

KSh 2039590

Completion

100%
Completed

renovation of kahithe primary & gatara primary e.c.d.e classrooms – murarandia ward

Proposed renovation of kahithe primary & gatara primary e.c.d.e classrooms – murarandia ward

Location

Kiharu — Murarandia (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2212430

Disbursed

KSh 2212430

Completion

100%
Completed

renovation of kiranga primary, karumu primary & gatitu primary e.c.d.e – muruka ward

Proposed renovation of kiranga primary, karumu primary & gatitu primary e.c.d.e – muruka ward

Location

Kandara — Muruka (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 4576115

Disbursed

KSh 4576115

Completion

100%
Completed

construction & renovation of makindi primary e.c.d.e classrooms – muruka ward

Proposed construction & renovation of makindi primary e.c.d.e classrooms – muruka ward

Location

Kandara — Muruka (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2210895

Disbursed

KSh 2210895

Completion

100%
Completed

completin of ngaburi e.c.d.e classroom and construction of an ablution block and refurbishment works at gachathaini e.c.d.e centre – muthithi ward

completin of ngaburi e.c.d.e classroom and construction of an ablution block and refurbishment works at gachathaini e.c.d.e centre

Location

Kigumo — Muthithi (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2100520

Disbursed

KSh 2100520

Completion

100%
Completed

renovation works of irigiro primary e.c.d.e classrooms – muthithi ward

Proposed renovation works of irigiro primary e.c.d.e classrooms – muthithi ward

Location

Kigumo — Muthithi (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1160160

Disbursed

KSh 1160160

Completion

100%
Completed

construction of waitwa primary school e.c.d.e classroom – ng’araria ward

Proposed construction of waitwa primary school e.c.d.e classroom – ng’araria ward

Location

Kandara — Ng'araria (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1298010

Disbursed

KSh 1298010

Completion

100%
Completed

refurbishment of muiri-ini & kifuu e.c.d.e classrooms & construction of ablution block – ng’araria ward

Proposed refurbishment of muiri-ini & kifuu e.c.d.e classrooms & construction of ablution block – ng’araria ward

Location

Kandara — Ng'araria (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2460370

Disbursed

KSh 2460370

Completion

100%
Completed

renovation of ng’araria e.c.d.e classrooms – ng’araria ward

Proposed renovation of ng’araria e.c.d.e classrooms – ng’araria ward

Location

Kandara — Ng'araria (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1581370

Disbursed

KSh 1581370

Completion

100%
Completed

renovation works of gitumbi, ihigaini & kiamwone e.c.d.e classrooms – nginda ward

Proposed renovation works of gitumbi, ihigaini & kiamwone e.c.d.e classrooms – nginda ward

Location

Maragua — Nginda (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2282880

Disbursed

KSh 2282880

Completion

100%
Completed

construction of kiangoma e.c.d.e classroom – nginda ward

Proposed construction of kiangoma e.c.d.e classroom – nginda ward

Location

Maragua — Nginda (Maragua)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1173510

Disbursed

KSh 1173510

Completion

100%
Completed

Prposed constyruction of wahu primary school e.c.d.e classrooms – ruchu ward

Prposed construction of wahu primary school e.c.d.e classrooms – ruchu ward

Location

Kandara — Ruchu (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1386725

Disbursed

KSh 1386725

Completion

100%
Completed

renovation works of gitiru, kiangari & kahiga primary school e.c.d.e classrooms – ruchu ward

Proposed renovation works of gitiru, kiangari & kahiga primary school e.c.d.e classrooms – ruchu ward

Location

Kandara — Ruchu (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2525980

Disbursed

KSh 2525980

Completion

100%
Completed

renovation works of mutheru & mukuria primary e.c.d.e classrooms – ruchu ward

Proposed renovation works of mutheru & mukuria primary e.c.d.e classrooms – ruchu ward

Location

Kandara — Ruchu (Kandara)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2589750

Disbursed

KSh 2589750

Completion

100%
Completed

construction of matara e.c.d.e classrooms and toilet block – rwathia ward

Proposed construction of matara e.c.d.e classrooms and toilet block – rwathia ward

Location

Kangema — Rwathia (Kangema)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 3746566

Disbursed

KSh 3746566

Completion

100%
Completed

construction of karima e.c.d.e classrooms and toilet block – rwathia ward

Proposed construction of karima e.c.d.e classrooms and toilet block – rwathia ward

Location

Kangema — Rwathia (Kangema)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 3089505

Disbursed

KSh 3089505

Completion

100%
Completed

renovation works of wanjerere primary e.c.d.e classrooms – rwathia ward

Proposed renovation works of wanjerere primary e.c.d.e classrooms – rwathia ward

Location

Kangema — Rwathia (Kangema)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 1160705

Disbursed

KSh 1160705

Completion

100%
Completed

construction of vidhu ramji primary e.c.d.e classroom & renovation of mbiri primary e.c.d.e classroom – township ward

Proposed construction of vidhu ramji primary e.c.d.e classroom & renovation of mbiri primary e.c.d.e classroom – township ward

Location

Kiharu — Township (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2033750

Disbursed

KSh 2033750

Completion

100%
Completed

Proposd construction of wanjengi primary e.c.d.e classroom & renovation of gitweku primary e.c.d.e classrooms – wangu ward

Proposd construction of wanjengi primary e.c.d.e classroom & renovation of gitweku primary e.c.d.e classrooms – wangu ward

Location

Kiharu — Wangu (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2390540

Disbursed

KSh 2390540

Completion

100%
Completed

renovation of gathinja, gitui & gitige primary e.c.d.e classrooms – wangu ward

Proposed renovation of gathinja, gitui & gitige primary e.c.d.e classrooms – wangu ward

Location

Kiharu — Wangu (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 3211080

Disbursed

KSh 3211080

Completion

100%
Completed

rehabilitation works to convert the existing structure to fire offices - phase 11

Proposed rehabilitation works to convert the existing structure to fire offices - phase 11

Location

Kiharu — Township (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 4353335

Disbursed

KSh 4353335

Completion

100%
Completed

construction of maternity ward at wahundura dispensary - kamacharia ward

Proposed construction of maternity ward at wahundura dispensary - kamacharia ward

Location

Mathioya — Kamacharia (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 4036162

Disbursed

KSh 4036162

Completion

100%
Completed

tiling and renovation works to githagara health center – mugoiri ward

Proposed tiling and renovation works to githagara health center

Location

Kiharu — Mugoiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 988473

Disbursed

KSh 988473

Completion

100%
Completed

completion of gathaithi social hall, construction of matharite weighing shed, and construction of a toilet block at murarandia health center – murarandia ward

Proposed completion of gathaithi social hall, construction of matharite weighing shed, and construction of a toilet block at murarandia health center

Location

Kiharu — Murarandia (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2301860

Disbursed

KSh 2301860

Completion

100%
Completed

construction of kiangage dispensary – township ward

Proposed construction of kiangage dispensary – township ward

Location

Kiharu — Township (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 22-23

Approved Cost

KSh 2675785

Disbursed

KSh 2675785

Completion

100%
Completed