All Projects

Browse and filter infrastructure projects

Filter Projects

Reset
Showing 101 to 200 of 237 projects
Export CSV

Construction of a Classroom,Renovation of a Classroom,Fencing and Construction of an Ablution Block at Njora-Kiariki ECDE Centre

Construction of a Classroom,Renovation of a Classroom,Fencing and Construction of an Ablution Block at Njora-Kiariki ECDE Centre

Location

KIGUMO — MUTHITHI (KIGUMO)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2822355

Disbursed

KSh 2822355

Completion

100%
Completed

Renovation & Fencing of Paul Mbiu,Kiawaihiga ECDE Cenres

Renovation & Fencing of Paul Mbiu,Kiawaihiga ECDE Cenres

Location

MARAGUA — MAKUYU (MARAGUA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 3300015

Disbursed

KSh 3300015

Completion

100%
Completed

Construction of Gaichanjiru and construction of mbogo & rurai E.C.D.E

Construction of Gaichanjiru and construction of mbogo & rurai E.C.D.E

Location

KIGUMO — KAHUMBU (KIGUMO)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 3002700

Disbursed

KSh 3002700

Completion

100%
Completed

Construction of John the Baptist (Kairi) & Riakindu E.C.D.E Centres

Construction of John the Baptist (Kairi) & Riakindu E.C.D.E Centres

Location

KIGUMO — KAHUMBU (KIGUMO)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 3002700

Disbursed

KSh 3002700

Completion

100%
Completed

Renovation of classroom at Gikoe & Wambwe ECDE centres

Renovation of classroom at Gikoe & Wambwe ECDE centres

Location

MATHIOYA — GITUGI (MATHIOYA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2967999

Disbursed

KSh 2967999

Completion

100%
Completed

Renovation of Githendu & muiri-ini ECDE centres

Renovation of Githendu & muiri-ini ECDE centres

Location

MATHIOYA — GITUGI (MATHIOYA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2802236

Disbursed

KSh 2802236

Completion

100%
Completed

Construction of wempa ECDE and renovation of Methi CCF ECDE classroom

Construction of wempa ECDE and renovation of Methi CCF ECDE classroom

Location

MARAGUA — KIMORORI WEMPA (MARAGUA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2934475

Disbursed

KSh 2934475

Completion

100%
Completed

Renovation of Mwanawikio and rubiru ECDE centres

Renovation of classrooms for Mwanawikio and rubiru ECDE centres

Location

GATANGA — KAKUZI/MITUMBIRI (GATANGA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2852160

Disbursed

KSh 2852160

Completion

100%
Completed

Renovation of karura and kiruri pry ECDE centre

Renovation of karura and kiruri classrooms ECDE centre

Location

KANGEMA — KANYENYAINI (KANGEMA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 3073933

Disbursed

KSh 3073933

Completion

100%
Completed

Construction of Matandara and Renovation of Kamukabi ECDE

Construction of Matandara and Renovation of Kamukabi ECDE

Location

KIGUMO — KINYONA (KIGUMO)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 3545285

Disbursed

KSh 3545285

Completion

100%
Completed

Construction of Gitungano ECDE Centre

Construction of Gitungano ECDE Centre

Location

KIHARU — MBIRI (KIHARU)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 1354220

Disbursed

KSh 1354220

Completion

100%
Completed

Construction of Njoguini Primary ECDE

Construction of Njoguini Primary ECDE

Location

KIGUMO — KINYONA (KIGUMO)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 1459755

Disbursed

KSh 1459755

Completion

100%
Completed

Renovation of Gituto Mumbi & Kirogo ECDE Center

Renovation of Gituto Mumbi & Kirogo ECDE Center

Location

KIHARU — WANGU (KIHARU)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 4064765

Disbursed

KSh 4064765

Completion

100%
Completed

Renovation of Giteme & Karangi Primary ECDE

Renovation of Giteme & Karangi Primary ECDE

Location

GATANGA — KARIARA (GATANGA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2938060

Disbursed

KSh 2938060

Completion

100%
Completed

Renovations and Construction of an Ablution Block at Kamunyaka ECDE

Renovations and Construction of an Ablution Block at Kamunyaka ECDE

Location

GATANGA — KARIARA (GATANGA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 1872465

Disbursed

KSh 1872465

Completion

100%
Completed

Renovation and construction of Kangangu ECDE classrooms and construction of Magoto ECDE

Renovation and construction of Kangangu ECDE classrooms and construction of Magoto ECDE

Location

MARAGUA — KIMORORI WEMPA (MARAGUA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 4140850

Disbursed

KSh 4140850

Completion

100%
Completed

Construction of Kagarie ECDE Centre and Pit Latrine Block at Mwea

Construction of Kagarie ECDE Centre and Pit Latrine Block at Mwea

Location

GATANGA — KARIARA (GATANGA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 1840500

Disbursed

KSh 1840500

Completion

100%
Completed

Construction and renovation of Iruini Primary

Construction and renovation of Iruini Primary

Location

KIGUMO — KANGARI (KIGUMO)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2362790

Disbursed

KSh 2362790

Completion

100%
Completed

Construction of Kahuti Primary ECDE

Construction of Kahuti Primary ECDE

Location

KIGUMO — KANGARI (KIGUMO)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 1464985

Disbursed

KSh 1464985

Completion

100%
Completed

Construction of Gaturi(Mugeka) ECDE Center

Construction of Gaturi(Mugeka) ECDE Center

Location

KIHARU — GATURI (KIHARU)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 1480660

Disbursed

KSh 1480660

Completion

100%
Completed

Construction of a classroom and a toilet block at Mugaaini ECDE Centre

Construction of a classroom and a toilet block at Mugaaini ECDE Centre

Location

KANDARA — NGARARIA (KANDARA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2297140

Disbursed

KSh 2297140

Completion

100%
Completed

Construction of classroom & Toilet block & Renovation at Githuri ECDE

Construction of classroom & Toilet block & Renovation at Githuri ECDE

Location

KIHARU — MBIRI (KIHARU)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 1655275

Disbursed

KSh 1655275

Completion

100%
Completed

Construction of classroom & Ablution block & Renovation works of Maragi ECDE

Construction of classroom & Ablution block & Renovation works of Maragi ECDE

Location

KIHARU — MBIRI (KIHARU)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 4845015

Disbursed

KSh 4845015

Completion

100%
Completed

Construction of classroom and fencing for Upendo ECDE

Construction of classroom and fencing for Upendo ECDE

Location

KIHARU — MBIRI (KIHARU)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2999580

Disbursed

KSh 2999580

Completion

100%
Completed

Renovation of Kiaruguru and Mabanda ECDE

Renovation of Kiaruguru and Mabanda ECDE classrooms

Location

GATANGA — GATANGA (GATANGA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 3190066

Disbursed

KSh 3190066

Completion

100%
Completed

Construction of 1no. ECDE classroom at Kaliala & Katooni ECDE centres

Construction of 1no. ECDE classroom at Kaliala & Katooni ECDE centres

Location

GATANGA — ITHANGA (GATANGA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 2793720

Disbursed

KSh 2793720

Completion

100%
Completed

Construction of Thuita dispensary-Kamacharia

Construction of Thuita dispensary-Kamacharia

Location

MATHIOYA — KAMACHARIA (MATHIOYA)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 7976839

Disbursed

KSh 7976839

Completion

100%
Completed

Renovation of Murarandia Health Centre

Renovation of Murarandia Health Centre

Location

KIHARU — MURARANDIA (KIHARU)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 3437445

Disbursed

KSh 3437445

Completion

100%
Completed

Completion of Kagongo dispensary-Kiru

Completion of Kagongo dispensary-Kiru

Location

MATHIOYA — KIRU (MATHIOYA)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 2274640

Disbursed

KSh 2274640

Completion

100%
Completed

renovation of Gatitu Dispensary -Kagunduini

renovation of Gatitu Dispensary -Kagunduini

Location

KANDARA — KAGUNDUINI (KANDARA)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 3641638

Disbursed

KSh 3641638

Completion

100%
Completed

extension, renovation dispensary ablution block, Construction of walkways to gates and incenerator - Muguru Ward in Muranga County

extension, renovation dispensary ablution block, Construction of walkways to gates and incenerator - Muguru Ward in Muranga County

Location

KANGEMA — MUGURU (KANGEMA)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 3057888

Disbursed

KSh 3057888

Completion

100%
Completed

Completion works for Kiangage Dispensary-Township

Completion works for Kiangage Dispensary-Township

Location

KIHARU — TOWNSHIP (KIHARU)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 1244590

Disbursed

KSh 1244590

Completion

100%
Completed

Renovation of Mungaria & Ruona dispensary-Ruchu

Renovation of Mungaria & Ruona dispensary-Ruchu

Location

KANDARA — RUCHU (KANDARA)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 852760

Disbursed

KSh 852760

Completion

100%
Completed

Completion of Boro Dispensary-Kinyona

Completion of Boro Dispensary-Kinyona

Location

KIGUMO — KINYONA (KIGUMO)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 1170718

Disbursed

KSh 1170718

Completion

100%
Completed

Renovation of Gathimaini dispensary-Kahumbu

Renovation of Gathimaini dispensary-Kahumbu

Location

KIGUMO — KAHUMBU (KIGUMO)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 3774160

Disbursed

KSh 3774160

Completion

100%
Completed

Renovation of Kambirwa Health Centre-Mbiri

Renovation of Kambirwa Health Centre-Mbiri

Location

KIHARU — MBIRI (KIHARU)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 2075049

Disbursed

KSh 2075049

Completion

100%
Completed

Construction of Laboratory at Mukumu dispensary

Construction of Laboratory at Mukumu dispensary

Location

KIHARU — MURARANDIA (KIHARU)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 543230

Disbursed

KSh 543230

Completion

100%
Completed

Renovation of Mabae Dispensary-Gatanga

Renovation of Mabae Dispensary-Gatanga

Location

GATANGA — GATANGA (GATANGA)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 1839222

Disbursed

KSh 1839222

Completion

100%
Completed

Ndakaini Maternity Renovation-Kariara

Ndakaini Maternity Renovation-Kariara

Location

GATANGA — KARIARA (GATANGA)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 2066450

Disbursed

KSh 2066450

Completion

100%
Completed

Construction of Kamacharia & Kairi Laboratory Phase 1

Construction of Kamacharia & Kairi Laboratory Phase 1

Location

MATHIOYA — KAMACHARIA (MATHIOYA)

Sector

HEALTH

Fiscal Year

FY 23-24

Approved Cost

KSh 4951130

Disbursed

KSh 4951130

Completion

100%
Completed

Poposed works in various ECDE centres -Gatanga Subcounty

Construction works for varoius facilities

Location

GATANGA — GATANGA (GATANGA), ITHANGA (GATANGA), KAKUZI/MITUMBIRI (GATANGA), KARIARA (GATANGA), KIHUMBUINI (GATANGA), MUGUMOINI (GATANGA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 300000

Disbursed

KSh 300000

Completion

100%
Completed

Poposed works for various ECDE centres-Kangema Subcounty

Construction works for various ECDE centres

Location

KANGEMA — KANYENYAINI (KANGEMA), MUGURU (KANGEMA), RWATHIA (KANGEMA)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 297000

Disbursed

KSh 297000

Completion

100%
Completed

Poposed works for various ECDE centres-Kiharu Subcounty

Construction works for various ECDE centres

Location

KIHARU — GATURI (KIHARU), MBIRI (KIHARU), MUGOIRI (KIHARU), MURARANDIA (KIHARU), TOWNSHIP (KIHARU), WANGU (KIHARU)

Sector

EDUCATION

Fiscal Year

FY 23-24

Approved Cost

KSh 297000

Disbursed

KSh 297000

Completion

100%
Completed

Construction of Warimwe Footbridge-Kinyona

Construction of Warimwe Footbridge

Location

KIGUMO — KINYONA (KIGUMO)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1617352

Disbursed

KSh 1617352

Completion

100%
Completed

Construction of Footbridges Karega-Warutara,Ngerechi-Pluto & Nduka Moja-Njunu-Kariara

Construction of Footbridges Karega-Warutara,Ngerechi-Pluto & Nduka Moja-Njunu-Kariara

Location

GATANGA — KARIARA (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1939140

Disbursed

KSh 1939140

Completion

100%
Completed

Construction of S.K footbridge-Kanyenyaini

Construction of S.K footbridge

Location

KANGEMA — KANYENYAINI (KANGEMA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1715640

Disbursed

KSh 1715640

Completion

100%
Completed

Construction of Geitwa-Kiambugi,Kibuu-Mukurweini Footbridges-Gaturi

Construction of Geitwa-Kiambugi,Kibuu-Mukurweini Footbridges

Location

KIHARU — GATURI (KIHARU)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1178068

Disbursed

KSh 1178068

Completion

100%
Completed

Grading & graveling of Ngurwe-ini Access Road-Gaichanjiru

Grading & graveling of Ngurwe-ini Access Road

Location

KANDARA — GAICHANJIRU (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3735780

Disbursed

KSh 3735780

Completion

100%
Completed

Grading of Access Roads-Kakuzi

Grading of Access Roads

Location

GATANGA — KAKUZI/MITUMBIRI (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1798000

Disbursed

KSh 1798000

Completion

100%
Completed

Grading and gravelling of Kiamathanji and Karugia access road - Gaichanjiru Ward

Grading and gravelling of Kiamathanji and Karugia access road - Gaichanjiru Ward

Location

KANDARA — GAICHANJIRU (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3527800

Disbursed

KSh 3527800

Completion

100%
Completed

Grading & gravelling works of Kibiko-Gitie-Gachibi Access Road-Kamacharia

Grading & gravelling works of Kibiko-Gitie-Gachibi Access Road-Kamacharia

Location

MATHIOYA — KAMACHARIA (MATHIOYA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3738390

Disbursed

KSh 3738390

Completion

100%
Completed

Grading & gravelling works of Gituamba-Kabuere-Gathangari Access Road-Muruka

Grading & gravelling works of Gituamba-Kabuere-Gathangari Access Road-Muruka

Location

KANDARA — MURUKA (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3289180

Disbursed

KSh 3289180

Completion

100%
Completed

Grading & gravelling of Sunset - Thumba - Gachamba access road-Ithiru

Grading & gravelling of Sunset - Thumba - Gachamba access road-Ithiru

Location

KANDARA — ITHIRU (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4749156

Disbursed

KSh 4749156

Completion

100%
Completed

Grading & gravelling works of Ndiara-ini Access road-Ng'araria

Grading & gravelling works of Ndiara-ini Access road-Ng'araria

Location

KANDARA — NGARARIA (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2822164

Disbursed

KSh 2822164

Completion

100%
Completed

Road works for Kangari - Umoja - Ngurwe-ini Catholic Church - Kirichiungu access Road- Kangari

Road works for Kangari - Umoja - Ngurwe-ini Catholic Church - Kirichiungu access Road- Kangari

Location

KIGUMO — KANGARI (KIGUMO)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 6605040

Disbursed

KSh 6605040

Completion

100%
Completed

Grading & gravelling works of Machengecha - kagundu-ini market - Kamunyaka access road-Kagunduni

Grading & gravelling works of Machengecha - kagundu-ini market - Kamunyaka access road-Kagunduni

Location

KANDARA — KAGUNDUINI (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3466080

Disbursed

KSh 3466080

Completion

100%
Completed

Grading & gravelling works of orphanage - mayor - mihali - kamunyaka - karobi access road -Ithiru

Grading & gravelling works of orphanage - mayor - mihali - kamunyaka - karobi access road -Ithiru

Location

KANDARA — ITHIRU (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4821656

Disbursed

KSh 4821656

Completion

100%
Completed

Grading & gravelling works of mahuti-ini - mai-ini - gathige shopping centre access road-Kagunduini

Grading & gravelling works of mahuti-ini - mai-ini - gathige shopping centre access road-Kagunduini

Location

KANDARA — KAGUNDUINI (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2837505

Disbursed

KSh 2837505

Completion

100%
Completed

Grading & gravelling works of maganjo - wanjihi, rwanguno - manyatta, kaharati - wamunderu, kiranga - araeli, aiagikiro - kabogoro - ihoero ndorome & mathingira - karugiro access road-Kamahuha

Grading & gravelling works of maganjo - wanjihi, rwanguno - manyatta, kaharati - wamunderu, kiranga - araeli, aiagikiro - kabogoro - ihoero ndorome & mathingira - karugiro access road-Kamahuha

Location

MARAGUA — KAMAHUHA (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4192240

Disbursed

KSh 4192240

Completion

100%
Completed

Grading & gravelling works of Three in one access road

Grading & gravelling works of Three in one access road

Location

KANDARA — KAGUNDUINI (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1610515

Disbursed

KSh 1610515

Completion

100%
Completed

Grading & gravelling works of kabwe - CFF Church access road

Grading & gravelling works of kabwe - CFF Church access road

Location

KIHARU — TOWNSHIP (KIHARU)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1839760

Disbursed

KSh 1839760

Completion

100%
Completed

Grading & gravelling works of kiamuhu - kwa ngeneri access road

Grading & gravelling works of kiamuhu - kwa ngeneri access road

Location

KANDARA — NGARARIA (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2822048

Disbursed

KSh 2822048

Completion

100%
Completed

Grading & gravelling of Kanyiyi-ini Catholic Church - kagenyo - Gatumbu shopping centre

Grading & gravelling of Kanyiyi-ini Catholic Church - kagenyo - Gatumbu shopping centre

Location

KANDARA — MURUKA (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 7165900

Disbursed

KSh 7165900

Completion

100%
Completed

Grading & gravelling of kagio-ini - Thuruthuru access road

Grading & gravelling of kagio-ini - Thuruthuru access road

Location

MATHIOYA — KIRU (MATHIOYA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 5594680

Disbursed

KSh 5594680

Completion

100%
Completed

Renovation of kahero and soronge E.C.D.E Centres

Renovation of kahero and soronge E.C.D.E Centres

Location

KIHARU — GATURI (KIHARU)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2445295

Disbursed

KSh 2445295

Completion

100%
Completed

Grading & gravelling works of githunguri - thithi, hamza - giatunyu - gaciani - kamathare - ngano - bembe access road

Grading & gravelling works of githunguri - thithi, hamza - giatunyu - gaciani - kamathare - ngano - bembe access road

Location

GATANGA — KIHUMBUINI (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3596928

Disbursed

KSh 3596928

Completion

100%
Completed

Grading & gravelling works of kahumbu polytechnic - muthithi access road

Grading & gravelling works of kahumbu polytechnic - muthithi access road

Location

KIGUMO — KAHUMBU (KIGUMO)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3123401

Disbursed

KSh 3123401

Completion

100%
Completed

Grading & gravelling works of old tarmac road - kwa Njanju - kabati coffee factory - tosheka access road

Grading & gravelling works of old tarmac road - kwa Njanju - kabati coffee factory - tosheka access road

Location

KANDARA — KAGUNDUINI (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3010925

Disbursed

KSh 3010925

Completion

100%
Completed

Opening of Rwathia Access

Opening of Rwathia Access

Location

KANGEMA — RWATHIA (KANGEMA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2648280

Disbursed

KSh 2648280

Completion

100%
Completed

Grading & gravelling works of Riambara coffee factory-Kibaaka-Gatuta-Kwa Mbuthia Access road

Grading & gravelling works of Riambara coffee factory-Kibaaka-Gatuta-Kwa Mbuthia Access road

Location

GATANGA — KIHUMBUINI (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3801784

Disbursed

KSh 3801784

Completion

100%
Completed

Grading & gravelling works of Manyaga Access road

Grading & gravelling works of Manyaga Access road

Location

KANGEMA — RWATHIA (KANGEMA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2478920

Disbursed

KSh 2478920

Completion

100%
Completed

Construction of kasoo-ni vented drift

Construction of kasoo-ni vented drift

Location

GATANGA — ITHANGA (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2186832

Disbursed

KSh 2186832

Completion

100%
Completed

Grading & gravelling of ihumbu plot - kangethu - mutaraho - kariti - karinga CatholicChurch access road

Grading & gravelling of ihumbu plot - kangethu - mutaraho - kariti - karinga CatholicChurch access road

Location

MARAGUA — NGINDA (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4648280

Disbursed

KSh 4648280

Completion

100%
Completed

Grading of Access Roads

Grading of Access Roads

Location

KIHARU — GATURI (KIHARU)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1786400

Disbursed

KSh 1786400

Completion

100%
Completed

Grading of Access Roads

Grading of Access Roads

Location

GATANGA — ITHANGA (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3052554

Disbursed

KSh 3052554

Completion

100%
Completed

Grading & gravelling of kabuku - kingotore access road

Grading & gravelling of kabuku - kingotore access road

Location

GATANGA — KAKUZI/MITUMBIRI (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 5327300

Disbursed

KSh 5327300

Completion

100%
Completed

Grading & gravelling works of gatumbi - githima access road

Grading & gravelling works of gatumbi - githima access road

Location

KIGUMO — KINYONA (KIGUMO)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3045000

Disbursed

KSh 3045000

Completion

100%
Completed

Grading & gravelling (spot improvement) of kandundu - giathuku access

Grading & gravelling (spot improvement) of kandundu - giathuku access

Location

KIGUMO — KINYONA (KIGUMO)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1881520

Disbursed

KSh 1881520

Completion

100%
Completed

Opening & drainage works of Gaichanjiru access roads

Opening & drainage works of Gaichanjiru access roads

Location

KANDARA — GAICHANJIRU (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2984880

Disbursed

KSh 2984880

Completion

100%
Completed

Grading & gravelling works of JJRoad-Gatundu Pry-Githima & Mugoiri Kadegenye via Wairagu Residence-JCT Kwa Paul Shopping Centre

Grading & gravelling works of JJRoad-Gatundu Pry-Githima & Mugoiri Kadegenye via Wairagu Residence-JCT Kwa Paul Shopping Centre

Location

KIHARU — MUGOIRI (KIHARU)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3451696

Disbursed

KSh 3451696

Completion

100%
Completed

Grading & gravelling works of Yamugwezi JCT-Shopping Centre-Kabius JCT-Yamugwe Sec-Catholic church & Ngaru Borehole JCT-Village Tank A ccess Road

Grading & gravelling works of Yamugwezi JCT-Shopping Centre-Kabius JCT-Yamugwe Sec-Catholic church & Ngaru Borehole JCT-Village Tank A ccess Road

Location

KIHARU — MUGOIRI (KIHARU)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4733960

Disbursed

KSh 4733960

Completion

100%
Completed

grading & gravelling works of Wamahiga-Kiawairimu-Kwa mianomiboco-ini-Njora-Kiara Access Roads.

grading & gravelling works of Wamahiga-Kiawairimu-Kwa mianomiboco-ini-Njora-Kiara Access Roads.

Location

KIGUMO — MUTHITHI (KIGUMO)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4737440

Disbursed

KSh 4737440

Completion

100%
Completed

Grading & gravelling of Kiamathanji & Karugia Access Road

Grading & gravelling of Kiamathanji & Karugia Access Road

Location

KANDARA — GAICHANJIRU (KANDARA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3527800

Disbursed

KSh 3527800

Completion

100%
Completed

Rehabilitation of Rimui Drift(Kirathani)

Rehabilitation of Rimui Drift(Kirathani)

Location

GATANGA — ITHANGA (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1019350

Disbursed

KSh 1019350

Completion

100%
Completed

Grading & Gravelling of Kwa Maina Nyerere-PCEA Ha Muguruki-Ha Nduma Gathimu Access Road

Grading & Gravelling of Kwa Maina Nyerere-PCEA Ha Muguruki-Ha Nduma Gathimu Access Road

Location

MARAGUA — NGINDA (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4475512

Disbursed

KSh 4475512

Completion

100%
Completed

Grading & gravelling works of Mutungano Access Road

Grading & gravelling works of Mutungano Access Road

Location

KIHARU — MURARANDIA (KIHARU)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2672872

Disbursed

KSh 2672872

Completion

100%
Completed

Grading and gravelling works of Zabka-Nginyi-Kabuku access road- Kimorori Ward

Grading and gravelling works of Zabka-Nginyi-Kabuku access road- Kimorori Ward

Location

MARAGUA — KIMORORI WEMPA (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2479268

Disbursed

KSh 2479268

Completion

100%
Completed

Grading and gravelling works of St Joseph Kiangage/Murari and Bishop Residence-Sport Cub-Kambi acess road

Grading and gravelling works of St Joseph Kiangage/Murari and Bishop Residence-Sport Cub-Kambi acess road

Location

KIHARU — TOWNSHIP (KIHARU)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2344244

Disbursed

KSh 2344244

Completion

100%
Completed

Grading & gravelling works of Laini-Kiarie Gatoro Access Road

Grading & gravelling works of Laini-Kiarie Gatoro Access Road

Location

GATANGA — MUGUMOINI (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 1799624

Disbursed

KSh 1799624

Completion

100%
Completed

Grading & gravelling works of Ndunyuchege Market Access Road

Grading & gravelling works of Ndunyuchege Market Access Road

Location

GATANGA — KARIARA (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2067120

Disbursed

KSh 2067120

Completion

100%
Completed

Drilling,Equiping & commissioning of Ithangarari Borehole

Drilling,Equiping & commissioning of Ithangarari Borehole

Location

GATANGA — MUGUMOINI (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4956070

Disbursed

KSh 4956070

Completion

100%
Completed

Emergency Intervention at the Kigoro clogged Twin Crossculvert

Emergency Intervention at the Kigoro clogged Twin Crossculvert

Location

GATANGA — KARIARA (GATANGA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 209960

Disbursed

KSh 209960

Completion

100%
Completed

Emergency works undertaken to clear soil and other Debris Material after 2 Landslides in Gathinja

Emergency works undertaken to clear soil and other Debris Material after 2 Landslides in Gathinja

Location

KIHARU — WANGU (KIHARU)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 561440

Disbursed

KSh 561440

Completion

100%
Completed

Grading & gravelling works of Kitune Access Road

Grading & gravelling works of Kitune Access Road

Location

MARAGUA — KAMBITI (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2716720

Disbursed

KSh 2716720

Completion

100%
Completed

Grading & gravelling works of Gaaci-Kagenyo & Itara Thagama Access Road

Grading & gravelling works of Gaaci-Kagenyo & Itara Thagama Access Road

Location

MARAGUA — ICHAGAKI (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3168250

Disbursed

KSh 3168250

Completion

100%
Completed

Construction of Mutithi-Kinoo Waterpan

Construction of Mutithi-Kinoo Waterpan

Location

MARAGUA — MAKUYU (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 889720

Disbursed

KSh 889720

Completion

100%
Completed

Grading & gravelling works of Kiabene-Kiawathangati-Githigi-Kiunyu & Startway-Wanjohi & Nduru Main Road Access Road

Grading & gravelling works of Kiabene-Kiawathangati-Githigi-Kiunyu & Startway-Wanjohi & Nduru Main Road Access Road

Location

MARAGUA — ICHAGAKI (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 3518164

Disbursed

KSh 3518164

Completion

100%
Completed

Grading & gravelling works of Wanyoro-Marumi-Mathingira & Karia-ini Access Road

Grading & gravelling works of Wanyoro-Marumi-Mathingira & Karia-ini Access Road

Location

KIGUMO — KIGUMO (KIGUMO)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4750780

Disbursed

KSh 4750780

Completion

100%
Completed

Supply of Pipes & Fittings for Kinoo/Muthini Water Project

Supply of Pipes & Fittings for Kinoo/Muthini Water Project

Location

MARAGUA — MAKUYU (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 4564194

Disbursed

KSh 4564194

Completion

100%
Completed

Pipe supply for Wathia-ini-Manyatta-Rwangunu-Kangita Water Project

Pipe supply for Wathia-ini-Manyatta-Rwangunu-Kangita Water Project

Location

MARAGUA — KAMAHUHA (MARAGUA)

Sector

INFRASTRUCTURE

Fiscal Year

FY 23-24

Approved Cost

KSh 2468480

Disbursed

KSh 2468480

Completion

100%
Completed