All Projects

Browse and filter infrastructure projects

Filter Projects

Reset
Showing 101 to 200 of 441 projects
Export CSV

Proposed Supply & Installation of Cabro paving Slabs at Kabuta Shopping Centre - Kiharu Subcounty

=B132

Location

Kiharu — Gaturi (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 25-26

Approved Cost

KSh 2994200

Disbursed

KSh 2994200

Completion

100%
Completed

Proposed Supply & Installation of Cabro paving Slabs at Kiarutara Shopping Centre - Gatanga Subcounty

=B133

Location

Gatanga — Kariara (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 25-26

Approved Cost

KSh 2996997

Disbursed

KSh 2996997

Completion

100%
Completed

Proposed Supply & Installation of Cabro paving Slabs for Thamara Catholic Access Roads Shopping Centre - Kigumo Subcounty

=B134

Location

Kigumo — Muthithi (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 25-26

Approved Cost

KSh 3815989

Disbursed

KSh 3815989

Completion

100%
Completed

Proposed Supply, repair and installation of streetlights in Muranga town-

Proposed Supply, repair and installation of streetlights in Muranga town-

Location

Kiharu — Township (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 25-26

Approved Cost

KSh 4555512

Disbursed

KSh 4555512

Completion

100%
Completed

Roadworks for Makindi Access Roads-Ithiru Ward

Roadworks for Makindi Access Roads-Ithiru Ward

Location

Kandara — Ithiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 1537978

Disbursed

KSh 1537978

Completion

100%
Completed

roadworks of Gaichaniru Catholic Church-Kahuho Access Road-Kakuzi Ward

roadworks of Gaichaniru Catholic Church-Kahuho Access Road-Kakuzi Ward

Location

Gatanga — Kakuzi/Mitubiri (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 6207605

Disbursed

KSh 6207605

Completion

100%
Completed

road works of Kaharati Stage-Kaharati plots Access Road-Kamahuha Ward

road works of Kaharati Stage-Kaharati plots Access Road-Kamahuha Ward

Location

Maragua — Kamahuha (Maragua)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2811175

Disbursed

KSh 2811175

Completion

100%
Completed

grading & gravelling works of Gathuku-Rukira Pry- Makuti Access Road-Muruka Ward

grading & gravelling works of Gathuku-Rukira Pry- Makuti Access Road-Muruka Ward

Location

Kandara — Muruka (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 4184042

Disbursed

KSh 4184042

Completion

100%
Completed

roadworks of Lenana Access Road at Githingiri Estate-Mugumoini ward

roadworks of Lenana Access Road at Githingiri Estate-Mugumoini ward

Location

N/A

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 4148308

Disbursed

KSh 4148308

Completion

100%
Completed

road works of Ha-Gitika-Gichia Access Road-Mugoiri Ward

road works of Ha-Gitika-Gichia Access Road-Mugoiri Ward

Location

Kiharu — Mugoiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2832988

Disbursed

KSh 2832988

Completion

100%
Completed

road works of Gatumbi-Githima Access Road-Kinyona Ward

road works of Gatumbi-Githima Access Road-Kinyona Ward

Location

Kigumo — Kinyona (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2927553

Disbursed

KSh 2927553

Completion

100%
Completed

Road Works of Kiahiti Acess Road -Kanyenya-ini Ward

Road Works of Kiahiti Acess Road -Kanyenya-ini Ward

Location

Kangema — Kanyenyaini (Kangema)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3043583

Disbursed

KSh 3043583

Completion

100%
Completed

Road works of Kigoro-Kiyo Access roads -Kambiti Ward

Road works of Kigoro-Kiyo Access roads -Kambiti Ward

Location

Maragua — Kambiti (Maragua)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3624347

Disbursed

KSh 3624347

Completion

100%
Completed

road works of Nanga -Kimutii-ini Access road-Kakuzi Mitubiri Ward

road works of Nanga -Kimutii-ini Access road-Kakuzi Mitubiri Ward

Location

Gatanga — Kakuzi/Mitubiri (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3088719

Disbursed

KSh 3088719

Completion

100%
Completed

Road Works of Mahuria Access roads -Kagundu-ini Ward

Road Works of Mahuria Access roads -Kagundu-ini Ward

Location

Kandara — Kagundu-ini (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3134460

Disbursed

KSh 3134460

Completion

100%
Completed

road works for Kamoro -Kagono Access roads -Ithiru Ward

road works for Kamoro -Kagono Access roads -Ithiru Ward

Location

Kandara — Ithiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2843663

Disbursed

KSh 2843663

Completion

100%
Completed

road works of Kiaro -Ndirii-ni -Mukoe access road -Kinyona ward

road works of Kiaro -Ndirii-ni -Mukoe access road -Kinyona ward

Location

Kigumo — Kinyona (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 4449983

Disbursed

KSh 4449983

Completion

100%
Completed

Road Works of Kariti Access roads -Kagundu-ini Ward

Road Works of Kariti Access roads -Kagundu-ini Ward

Location

Kandara — Kagundu-ini (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3581846

Disbursed

KSh 3581846

Completion

100%
Completed

road Work for Gitindima Access road

road Work for Gitindima Access road

Location

Kiharu — Mbiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3578600

Disbursed

KSh 3578600

Completion

100%
Completed

Grading of access roads- Wangu Ward

Grading of access roads- Wangu Ward

Location

Kiharu — Wangu (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2397850

Disbursed

KSh 2397850

Completion

100%
Completed

road works of Mbari ya Kiiru -Mirichu & Mwea - Ndutumi Access road - Mugoiri Ward.

road works of Mbari ya Kiiru -Mirichu & Mwea - Ndutumi Access road - Mugoiri Ward.

Location

Kiharu — Mugoiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2862753

Disbursed

KSh 2862753

Completion

100%
Completed

Improvement of Sand Harvesting Access roads - Gaturi Ward.

Improvement of Sand Harvesting Access roads - Gaturi Ward.

Location

Kiharu — Gaturi (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3447251

Disbursed

KSh 3447251

Completion

100%
Completed

road works for Kibiriri Access road - Ichagaki Ward

road works for Kibiriri Access road - Ichagaki Ward

Location

Maragua — Ichagaki (Maragua)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 5448910

Disbursed

KSh 5448910

Completion

100%
Completed

road works at Kagaa Access road

road works at Kagaa Access road

Location

Kandara — Gaichanjiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 4193324

Disbursed

KSh 4193324

Completion

100%
Completed

road works - Makuyu Ward

road works - Makuyu Ward

Location

Maragua — Makuyu (Maragua)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2900750

Disbursed

KSh 2900750

Completion

100%
Completed

road works for Gachomo -Kariaini -Kirurumo & Kiawambutu -Kiriti Acess roads - Muruka Ward

road works for Gachomo -Kariaini -Kirurumo & Kiawambutu -Kiriti Acess roads - Muruka Ward

Location

Kandara — Muruka (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 6185559

Disbursed

KSh 6185559

Completion

100%
Completed

road works of Mutheru -Wakamiri access road

road works of Mutheru -Wakamiri access road

Location

Kandara — Ruchu (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3864669

Disbursed

KSh 3864669

Completion

100%
Completed

road works of Mathare-ini -ithanji & Kirere -Kindiri Access road - Kigumo ward

road works of Mathare-ini -ithanji & Kirere -Kindiri Access road - Kigumo ward

Location

Kigumo — Kigumo (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3623617

Disbursed

KSh 3623617

Completion

100%
Completed

road works of Mungetho -Huho-ini & Mihango dispensary - Mataka Access roads - Kambiti ward

road works of Mungetho -Huho-ini & Mihango dispensary - Mataka Access roads - Kambiti ward

Location

Maragua — Kambiti (Maragua)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3091039

Disbursed

KSh 3091039

Completion

100%
Completed

road Works - Ithanga Ward

road Works - Ithanga Ward

Location

Gatanga — Ithanga (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2985452

Disbursed

KSh 2985452

Completion

100%
Completed

Road works of Ngararia - Gitiri Access road -Ngararia Ward

Road works of Ngararia - Gitiri Access road -Ngararia Ward

Location

Kandara — Ng'araria (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3110764

Disbursed

KSh 3110764

Completion

100%
Completed

Road works- Kinyona ward

Road works- Kinyona ward

Location

Kigumo — Kinyona (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 1546280

Disbursed

KSh 1546280

Completion

100%
Completed

Road works - Kangari ward

Road works - Kangari ward

Location

Kigumo — Kangari (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 1659809

Disbursed

KSh 1659809

Completion

100%
Completed

road works at ACK Kandundu Church & Turbo Hill Access road - Township ward

road works at ACK Kandundu Church & Turbo Hill Access road - Township ward

Location

Kiharu — Township (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 5508176

Disbursed

KSh 5508176

Completion

100%
Completed

Road works of Gathama- Thuita access and Rurii- Kiunyu access road Kihumbuini Ward

road works of Gathama- Thuita access and Rurii- Kiunyu access road Kihumbuini Ward

Location

Gatanga — Kihumbu-ini (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3186452

Disbursed

KSh 3186452

Completion

100%
Completed

road works of Mathingira access road Kamahuha Ward

road works of Mathingira access road Kamahuha Ward

Location

Maragua — Kamahuha (Maragua)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2943565

Disbursed

KSh 2943565

Completion

100%
Completed

road works of Kiangenye access road -Kanyenyaini Ward

road works of Kiangenye access road -Kanyenyaini Ward

Location

Kangema — Kanyenyaini (Kangema)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 4200000

Disbursed

KSh 4200000

Completion

100%
Completed

road works of Kairi-ini access road Gitugi Ward

road works of Kairi-ini access road Gitugi Ward

Location

Mathioya — Gitugi (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2894745

Disbursed

KSh 2894745

Completion

100%
Completed

road works of Karii- Kayahwe and Inoi- Ihigaini access road Murarandia Ward

road works of Karii- Kayahwe and Inoi- Ihigaini access road Murarandia Ward

Location

Kiharu — Murarandia (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3092258

Disbursed

KSh 3092258

Completion

100%
Completed

road works of Kenyanjeru Karima and Wathani access road Rwathia Ward

road works of Kenyanjeru Karima and Wathani access road Rwathia Ward

Location

Kangema — Rwathia (Kangema)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3001000

Disbursed

KSh 3001000

Completion

100%
Completed

road works of Mananga Posta Kianjoma- Gikoe access roads and Construction of Gitereki- Kandara stairs Kiru Ward

road works of Mananga Posta Kianjoma- Gikoe access roads and Construction of Gitereki- Kandara stairs Kiru Ward

Location

Mathioya — Kiru (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 5367084

Disbursed

KSh 5367084

Completion

100%
Completed

road works of River Nyumbo- Ndonga JCT access road Kahumbu Ward

road works of River Nyumbo- Ndonga JCT access road Kahumbu Ward

Location

Kigumo — Kahumbu (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2951107

Disbursed

KSh 2951107

Completion

100%
Completed

road works of Kimiri access road and Kiguoya access road Ithiru Ward

road works of Kimiri access road and Kiguoya access road Ithiru Ward

Location

Kandara — Ithiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2850393

Disbursed

KSh 2850393

Completion

100%
Completed

road works of Kiratu JCT- Kigio JCT access road Mugumoini Ward

road works of Kiratu JCT- Kigio JCT access road Mugumoini Ward

Location

Gatanga — Mugumo-ini (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2938628

Disbursed

KSh 2938628

Completion

100%
Completed

road works of White gate- Gitige access road and Gatwariga- Gitiri access roads- Kariara Ward

road works of White gate- Gitige access road and Gatwariga- Gitiri access roads- Kariara Ward

Location

Gatanga — Kariara (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2896979

Disbursed

KSh 2896979

Completion

100%
Completed

road works of Isabela Farm- Silanga Bridge and Hawamungura- Mama Iddi access road- Kakuzi Ward

road works of Isabela Farm- Silanga Bridge and Hawamungura- Mama Iddi access road- Kakuzi Ward

Location

Gatanga — Kakuzi/Mitubiri (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3530213

Disbursed

KSh 3530213

Completion

100%
Completed

road works of Kanyore access road- Kangari Ward

road works of Kanyore access road- Kangari Ward

Location

Kigumo — Kangari (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 2904115

Disbursed

KSh 2904115

Completion

100%
Completed

road works of Nguruweini Sec and Githaiti Primary access road- Gaichanjiru Ward

road works of Nguruweini Sec and Githaiti Primary access road- Gaichanjiru Ward

Location

Kandara — Gaichanjiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3186256

Disbursed

KSh 3186256

Completion

100%
Completed

Supply & Installation of Cabro Paving Slabs at Gatunyu Shopping Centre-Gatanga Subcounty

Supply & Installation of Cabro Paving Slabs

Location

Gatanga — Gatanga (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 3396198

Disbursed

KSh 3396198

Completion

100%
Completed

Supply & Installation of Cabro paving Slabs at Sabasaba Shopping Center-Maragua Subcounty

Supply & Installation of Cabro paving Slabs

Location

Maragua — Kamahuha (Maragua)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 24894306

Disbursed

KSh 24894306

Completion

100%
Completed

Supply & Installation of Cabro Paving Slabs at Gitugi Shopping Center-Mathioya Subcounty

Supply & Installation of Cabro Paving

Location

Mathioya — Gitugi (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 18927394

Disbursed

KSh 18927394

Completion

100%
Completed

Supply & Installation of Cabro Paving Slabs at Kirere Shopping Center-Kigumo Sucounty

Supply & Installation of Cabro Paving Slabs

Location

Kigumo — Kigumo (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 16434779

Disbursed

KSh 16434779

Completion

100%
Completed

Supply & Installation of Cabro Paving Slabs at Kihoya Shopping Centre-Kangema Subcounty

Supply & Installation of Cabro Paving Slabs at Kihoya Shopping Centre-Kangema Subcounty

Location

Kangema — Rwathia (Kangema)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 15734828

Disbursed

KSh 15734828

Completion

100%
Completed

Supply & Installation of Cabro Paving Slabs at Muruka Shopping Centre-Kandara Subcounty

Supply & Installation of Cabro Paving Slabs at Muruka Shopping Centre-Kandara Subcounty

Location

Kandara — Muruka (Kandara)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 13438014

Disbursed

KSh 13438014

Completion

100%
Completed

Supply & Installation of Cabro Paving Slabs at Kirogo & Wanjengi Shopping Center-Kiharu Subcounty

Supply & Installation of Cabro Paving Slabs at Kirogo & Wanjengi Shopping Center-Kiharu Subcounty

Location

Kiharu — Wangu (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 24-25

Approved Cost

KSh 14064344

Disbursed

KSh 14064344

Completion

100%
Completed

Construction of Warimwe Footbridge-Kinyona

Construction of Warimwe Footbridge

Location

Kigumo — Kinyona (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1617352

Disbursed

KSh 1617352

Completion

100%
Completed

Construction of Footbridges Karega-Warutara,Ngerechi-Pluto & Nduka Moja-Njunu-Kariara

Construction of Footbridges Karega-Warutara,Ngerechi-Pluto & Nduka Moja-Njunu-Kariara

Location

Gatanga — Kariara (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1939140

Disbursed

KSh 1939140

Completion

100%
Completed

Construction of S.K footbridge-Kanyenyaini

Construction of S.K footbridge

Location

Kigumo — Kanyenyaini (Kangema)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1715640

Disbursed

KSh 1715640

Completion

100%
Completed

Construction of Geitwa-Kiambugi,Kibuu-Mukurweini Footbridges-Gaturi

Construction of Geitwa-Kiambugi,Kibuu-Mukurweini Footbridges

Location

Kiharu — Gaturi (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1178068

Disbursed

KSh 1178068

Completion

100%
Completed

Grading & graveling of Ngurwe-ini Access Road-Gaichanjiru

Grading & graveling of Ngurwe-ini Access Road

Location

Kandara — Gaichanjiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3735780

Disbursed

KSh 3735780

Completion

100%
Completed

Grading of Access Roads-Kakuzi

Grading of Access Roads

Location

Maragua — Kakuzi/Mitubiri (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1798000

Disbursed

KSh 1798000

Completion

100%
Completed

Grading and gravelling of Kiamathanji and Karugia access road - Gaichanjiru Ward

Grading and gravelling of Kiamathanji and Karugia access road - Gaichanjiru Ward

Location

Kandara — Gaichanjiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3527800

Disbursed

KSh 3527800

Completion

100%
Completed

Grading & gravelling works of Kibiko-Gitie-Gachibi Access Road-Kamacharia

Grading & gravelling works of Kibiko-Gitie-Gachibi Access Road-Kamacharia

Location

Mathioya — Kamacharia (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3738390

Disbursed

KSh 3738390

Completion

100%
Completed

Grading & gravelling works of Gituamba-Kabuere-Gathangari Access Road-Muruka

Grading & gravelling works of Gituamba-Kabuere-Gathangari Access Road-Muruka

Location

Kandara — Muruka (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3289180

Disbursed

KSh 3289180

Completion

100%
Completed

Grading & gravelling of Sunset - Thumba - Gachamba access road-Ithiru

Grading & gravelling of Sunset - Thumba - Gachamba access road-Ithiru

Location

Kandara — Ithiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 4749156

Disbursed

KSh 4749156

Completion

100%
Completed

Grading & gravelling works of Ndiara-ini Access road-Ng'araria

Grading & gravelling works of Ndiara-ini Access road-Ng'araria

Location

Kandara — Ng'araria (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2822164

Disbursed

KSh 2822164

Completion

100%
Completed

Road works for Kangari - Umoja - Ngurwe-ini Catholic Church - Kirichiungu access Road- Kangari

Road works for Kangari - Umoja - Ngurwe-ini Catholic Church - Kirichiungu access Road- Kangari

Location

Kigumo — Kangari (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 6605040

Disbursed

KSh 6605040

Completion

100%
Completed

Grading & gravelling works of Machengecha - kagundu-ini market - Kamunyaka access road-Kagunduni

Grading & gravelling works of Machengecha - kagundu-ini market - Kamunyaka access road-Kagunduni

Location

Kandara — Kagundu-ini (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3466080

Disbursed

KSh 3466080

Completion

100%
Completed

Grading & gravelling works of orphanage - mayor - mihali - kamunyaka - karobi access road -Ithiru

Grading & gravelling works of orphanage - mayor - mihali - kamunyaka - karobi access road -Ithiru

Location

Kandara — Ithiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 4821656

Disbursed

KSh 4821656

Completion

100%
Completed

Grading & gravelling works of mahuti-ini - mai-ini - gathige shopping centre access road-Kagunduini

Grading & gravelling works of mahuti-ini - mai-ini - gathige shopping centre access road-Kagunduini

Location

Kandara — Kagundu-ini (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2837505

Disbursed

KSh 2837505

Completion

100%
Completed

Grading & gravelling works of maganjo - wanjihi, rwanguno - manyatta, kaharati - wamunderu, kiranga - araeli, aiagikiro - kabogoro - ihoero ndorome & mathingira - karugiro access road-Kamahuha

Grading & gravelling works of maganjo - wanjihi, rwanguno - manyatta, kaharati - wamunderu, kiranga - araeli, aiagikiro - kabogoro - ihoero ndorome & mathingira - karugiro access road-Kamahuha

Location

Maragua — Kamahuha (Maragua)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 4192240

Disbursed

KSh 4192240

Completion

100%
Completed

Grading & gravelling works of Three in one access road

Grading & gravelling works of Three in one access road

Location

Kandara — Kagundu-ini (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1610515

Disbursed

KSh 1610515

Completion

100%
Completed

Grading & gravelling works of kabwe - CFF Church access road

Grading & gravelling works of kabwe - CFF Church access road

Location

Kiharu — Township (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1839760

Disbursed

KSh 1839760

Completion

100%
Completed

Grading & gravelling works of kiamuhu - kwa ngeneri access road

Grading & gravelling works of kiamuhu - kwa ngeneri access road

Location

Kandara — Ng'araria (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2822048

Disbursed

KSh 2822048

Completion

100%
Completed

Grading & gravelling of Kanyiyi-ini Catholic Church - kagenyo - Gatumbu shopping centre

Grading & gravelling of Kanyiyi-ini Catholic Church - kagenyo - Gatumbu shopping centre

Location

Kandara — Muruka (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 7165900

Disbursed

KSh 7165900

Completion

100%
Completed

Grading & gravelling of kagio-ini - Thuruthuru access road

Grading & gravelling of kagio-ini - Thuruthuru access road

Location

Mathioya — Kiru (Mathioya)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 5594680

Disbursed

KSh 5594680

Completion

100%
Completed

Renovation of kahero and soronge E.C.D.E Centres

Renovation of kahero and soronge E.C.D.E Centres

Location

Kiharu — Gaturi (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2445295

Disbursed

KSh 2445295

Completion

100%
Completed

Grading & gravelling works of githunguri - thithi, hamza - giatunyu - gaciani - kamathare - ngano - bembe access road

Grading & gravelling works of githunguri - thithi, hamza - giatunyu - gaciani - kamathare - ngano - bembe access road

Location

Gatanga — Kihumbu-ini (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3596928

Disbursed

KSh 3596928

Completion

100%
Completed

Grading & gravelling works of kahumbu polytechnic - muthithi access road

Grading & gravelling works of kahumbu polytechnic - muthithi access road

Location

Kigumo — Kahumbu (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3123401

Disbursed

KSh 3123401

Completion

100%
Completed

Grading & gravelling works of old tarmac road - kwa Njanju - kabati coffee factory - tosheka access road

Grading & gravelling works of old tarmac road - kwa Njanju - kabati coffee factory - tosheka access road

Location

Kandara — Kagundu-ini (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3010925

Disbursed

KSh 3010925

Completion

100%
Completed

Opening of Rwathia Access

Opening of Rwathia Access

Location

Kangema — Rwathia (Kangema)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2648280

Disbursed

KSh 2648280

Completion

100%
Completed

Grading & gravelling works of Riambara coffee factory-Kibaaka-Gatuta-Kwa Mbuthia Access road

Grading & gravelling works of Riambara coffee factory-Kibaaka-Gatuta-Kwa Mbuthia Access road

Location

Gatanga — Kihumbu-ini (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3801784

Disbursed

KSh 3801784

Completion

100%
Completed

Grading & gravelling works of Manyaga Access road

Grading & gravelling works of Manyaga Access road

Location

Kangema — Rwathia (Kangema)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2478920

Disbursed

KSh 2478920

Completion

100%
Completed

Construction of kasoo-ni vented drift

Construction of kasoo-ni vented drift

Location

Gatanga — Ithanga (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2186832

Disbursed

KSh 2186832

Completion

100%
Completed

Grading & gravelling of ihumbu plot - kangethu - mutaraho - kariti - karinga CatholicChurch access road

Grading & gravelling of ihumbu plot - kangethu - mutaraho - kariti - karinga CatholicChurch access road

Location

Maragua — Nginda (Maragua)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 4648280

Disbursed

KSh 4648280

Completion

100%
Completed

Grading of Access Roads

Grading of Access Roads

Location

Kiharu — Gaturi (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1786400

Disbursed

KSh 1786400

Completion

100%
Completed

Grading of Access Roads

Grading of Access Roads

Location

Gatanga — Ithanga (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3052554

Disbursed

KSh 3052554

Completion

100%
Completed

Grading & gravelling of kabuku - kingotore access road

Grading & gravelling of kabuku - kingotore access road

Location

Kandara — Kakuzi/Mitubiri (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 5327300

Disbursed

KSh 5327300

Completion

100%
Completed

Grading & gravelling works of gatumbi - githima access road

Grading & gravelling works of gatumbi - githima access road

Location

Kigumo — Kinyona (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3045000

Disbursed

KSh 3045000

Completion

100%
Completed

Grading & gravelling (spot improvement) of kandundu - giathuku access

Grading & gravelling (spot improvement) of kandundu - giathuku access

Location

Kigumo — Kinyona (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1881520

Disbursed

KSh 1881520

Completion

100%
Completed

Opening & drainage works of Gaichanjiru access roads

Opening & drainage works of Gaichanjiru access roads

Location

Kandara — Gaichanjiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2984880

Disbursed

KSh 2984880

Completion

100%
Completed

Grading & gravelling works of JJRoad-Gatundu Pry-Githima & Mugoiri Kadegenye via Wairagu Residence-JCT Kwa Paul Shopping Centre

Grading & gravelling works of JJRoad-Gatundu Pry-Githima & Mugoiri Kadegenye via Wairagu Residence-JCT Kwa Paul Shopping Centre

Location

Kiharu — Mugoiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3451696

Disbursed

KSh 3451696

Completion

100%
Completed

Grading & gravelling works of Yamugwezi JCT-Shopping Centre-Kabius JCT-Yamugwe Sec-Catholic church & Ngaru Borehole JCT-Village Tank A ccess Road

Grading & gravelling works of Yamugwezi JCT-Shopping Centre-Kabius JCT-Yamugwe Sec-Catholic church & Ngaru Borehole JCT-Village Tank A ccess Road

Location

Kiharu — Mugoiri (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 4733960

Disbursed

KSh 4733960

Completion

100%
Completed

grading & gravelling works of Wamahiga-Kiawairimu-Kwa mianomiboco-ini-Njora-Kiara Access Roads.

grading & gravelling works of Wamahiga-Kiawairimu-Kwa mianomiboco-ini-Njora-Kiara Access Roads.

Location

Kigumo — Muthithi (Kigumo)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 4737440

Disbursed

KSh 4737440

Completion

100%
Completed

Grading & gravelling of Kiamathanji & Karugia Access Road

Grading & gravelling of Kiamathanji & Karugia Access Road

Location

Kandara — Gaichanjiru (Kandara)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 3527800

Disbursed

KSh 3527800

Completion

100%
Completed

Rehabilitation of Rimui Drift(Kirathani)

Rehabilitation of Rimui Drift(Kirathani)

Location

Gatanga — Ithanga (Gatanga)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 1019350

Disbursed

KSh 1019350

Completion

100%
Completed

Grading & Gravelling of Kwa Maina Nyerere-PCEA Ha Muguruki-Ha Nduma Gathimu Access Road

Grading & Gravelling of Kwa Maina Nyerere-PCEA Ha Muguruki-Ha Nduma Gathimu Access Road

Location

Maragua — Nginda (Maragua)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 4475512

Disbursed

KSh 4475512

Completion

100%
Completed

Grading & gravelling works of Mutungano Access Road

Grading & gravelling works of Mutungano Access Road

Location

Kiharu — Murarandia (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2672872

Disbursed

KSh 2672872

Completion

100%
Completed

Grading and gravelling works of Zabka-Nginyi-Kabuku access road- Kimorori Ward

Grading and gravelling works of Zabka-Nginyi-Kabuku access road- Kimorori Ward

Location

Maragua — Kimorori/Wempa (Maragua)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2479268

Disbursed

KSh 2479268

Completion

100%
Completed

Grading and gravelling works of St Joseph Kiangage/Murari and Bishop Residence-Sport Cub-Kambi acess road

Grading and gravelling works of St Joseph Kiangage/Murari and Bishop Residence-Sport Cub-Kambi acess road

Location

Kiharu — Township (Kiharu)

Sector

Infrastructure

Fiscal Year

FY 23-24

Approved Cost

KSh 2344244

Disbursed

KSh 2344244

Completion

100%
Completed